pharma@sz-pharma.com    +86-18241958031
Cont

Have any Questions?

+86-18241958031

industrial air shower
video
industrial air shower

industrial air shower

The installation steps of air shower:
1. Determine the installation location and ensure that the ground is level.
2. Place the air shower box and install the box.
3. Pre tighten the screws at the bottom of the box and the air shower room.
4. Install double doors for the air shower room.
5. Install the top plate and pre tighten the screws between the box and the top plate.
6. Adjust the horizontal position of the air shower room and fix it with each connecting screw.
7. Connect the air shower line.
8. Install the air shower panel.
9. Debug the air shower room.
10. Delivery for use.
Send Inquiry

Product Introduction

 

Suzhou Pharma Machinery supplies you with the optimal High-quality Stainless Steel Air Shower!

 

 

Product Introduction

 

The function of the industrial air shower

Many production environments have very high requirements for cleanliness, such as pharmaceutical factories and electronic chip workshops. If there is a little dust and impurities, the product quality may be affected. At this time, the industrial air shower room comes in handy!


First, it can clean up all dust and pollutants. If people go directly into the high-standard clean area, the dust, hair, small fibers, etc. on their bodies will follow them in and make trouble. The air shower room is like a powerful hair dryer, using high-speed airflow to blow away these things to ensure that external dirt does not enter the clean area. The same is true for the items transported in. Once the surface dust and impurities are treated by it, they are clean and meet the requirements, and the cleanliness of the production environment is guaranteed.


Secondly, the industrial air shower can prevent cross-contamination. The cleanliness of different areas is different. If pollutants in high-pollution areas run to low-pollution areas, it will be a big trouble. Different processes in pharmaceutical factories are separated by air showers, and no one affects anyone else, so the quality and safety of drugs are stable. In places where people come and go, everyone can clean up in the air shower room before entering the clean area, stop all the dirt on their bodies, and reduce the risk of pollution.


Finally, it can also improve cleanliness. The air shower room has a super powerful filtration system, which can filter out small particles in the air. It continuously circulates air and filters impurities, and only clean air is sent into the clean area. In industries with extremely high cleanliness requirements, the air shower room is a "great contributor". With it, the production environment meets the standards, and the product quality and reliability have a foundation.

 

 

Product Parameter

 

Model

PH-1300-P1

PH-1300-PC1

PH-1300-P2

PH-1300-P3

Outer Dimensions

W×D×H(mm)

1300×1000×2100

1300×1500×2100

1300×2000×2100

1300×3000×2100

Inner Dimensions

W1×D1×H1(mm)

800×930×1960

800×1430×1960

800×930×1960

800×930×1960

Speed (m/s)

25~27

Nozzle No.

12

18

24

36

Structure

Cabin: Pre-painted cold work steel sheet.Stainless steel

Door: 5mm glass and built-in automatic door closer

Lighting

LED, built-in type

Dust Collection Efficiency

Over 99.99% 0.3μm D.O.P TEST

HEPA Dimension ×Quantity

595×595×80×2pcs

595×595×80×2pcs

595×595×80×4pcs

595×595×80×4pcs

Showering Time

0-99s adjustable(FACTORY SETTING 10S)

Power Supply

380V 50Hz, 3Phase/220V 60Hz 1Phase

 

 

Product pictures
product-496-372
product-496-372
product-496-372
product-496-372

 

 

When debugging the industrial air shower, attention should be paid to:

 

1. Check if all components are intact and securely installed, and if the tightness between the fan and motor is appropriate.

2. Check if the shock absorber fixing clip of the fan base has been removed.

3. Ensure that the inside of the box is clean, especially the primary and high-efficiency filters, and there should be no debris.

4. Check whether the sealing adhesive between the boxes is damaged or detached, and whether the sealing is good.

5. Check if the voltage and wiring of the three-phase power supply meet the requirements, and if the grounding is good.

6. Check if the indicator light is on and if the switch is functioning properly.

7. Check the fan's direction of rotation by jogging, and if there is an error, immediately stop the machine and switch the phase line.

8. Use a clamp gauge to measure the starting current of the air shower and check if the operating current is normal.

 

 

Our Product
product-496-372
precision parts processing line
product-496-372
precision parts processing line
product-496-372
our factory appearance

 

 

Company profile

 

product-729-516

 

product-546-460
product-347-259 product-469-317
product-469-402
product-470-401
product-469-404
product-468-401
product-470-404
product-471-403

 

Certifications

 

6a63f1388db13d6071051676387902e
97fbc27c57c0f363dd8bf19238dad0c
b024ca9a7320b74bddb9ac01dba2b57
d1d63733e4b669ad47ab66adf2a7867
b81bbbb302a10619fae59b3e827bb26

 

 

 

Hot Tags: industrial air shower, China industrial air shower manufacturers, suppliers, factory, 575x575mm fan filter unit, machine made pu sandwich panels, modular cleanroom construction solution, pocket type bag hepa filter, stainless steel air shower

Send Inquiry

(0/10)

clearall