In the clean room project, clean room door and clean room window are part of the main building of the clean room. In addition to being beautiful, the sealing and firmness of door and window also play an important role in the overall structure of the clean room. Therefore, after the door and window project is completed, the acceptance work should be carefully carried out.
Check the appearance of the doors and windows, whether the surface is flat and smooth, there should be no scratches, dents or spots, and no rust. After installation, check the firmness, whether it is closed tightly after closing, and whether the door lock is flexible after multiple tests.The thickness of the door and window frames is consistent with that of the wall. The deviation between the door and window body, door and window frame and wall cannot exceed 1mm. The deviation part should be fixed and filled with sealant or sealing materials to prevent dust and foreign objects from entering and causing pollution.
After the window is installed, it should be kept at the same level as the wall panel. If it cannot be kept at the same level, try to choose an arc transition. If the noise control in the clean room is strict, double-layer glass is a good choice. Be careful to ensure that there is no dust or foreign matter between the double-layer glass before installation.
After the doors and windows are installed, an air tightness test should be carried out. If the air tightness is unqualified, it will affect the cleanliness level of the clean room, resulting in internal purified air leakage and external non-purified air invasion.




Suzhou Pharma Machinery Co.,Ltd.
2025/02/19
Icey