The design of ventilation and air conditioning system of cleanroom should meet the requirements of cleanliness, temperature and humidity control, air flow organization, etc. The selection of air ducts should meet the requirements of cleanliness, corrosion resistance, fire prevention, etc. The commonly used materials are galvanized steel, stainless steel, aluminum alloy and so on. Thermal insulation materials should have good thermal insulation properties and corrosion resistance. Air conditioning units, fans and other equipment should choose products with stable performance, low noise and high energy efficiency.
Specific process:
According to the requirements of the design drawings, the production and installation of the air duct. The dimensional accuracy and quality requirements should be strictly controlled during the production process to ensure that the air duct meets the design requirements. During the installation, attention should be paid to the support fixing and sealing of the air duct to ensure the stability and sealing of the air duct.
Install air conditioning units, fans and other equipment according to the design requirements. Pay attention to the levelness, verticality, and firmness of the device during installation. Perform necessary debugging and testing on the device to ensure its normal operation.
During the connection of the air duct and the equipment, the connection quality should be strictly controlled to ensure that the connection is firm and the sealing is good. At the same time, necessary inspections and tests should also be carried out on the connection parts to ensure that they meet the requirements.
After the installation of ventilation and air conditioning system is completed, the system debugging and optimization work is carried out. During the debugging process, the system parameters should be gradually adjusted to observe the reaction and performance of the system.